FG Set To Close Third Mainland Bridge For Two Weeks

0
77
Spread the love

The Federal Government is set to close the Lagos Island-bound traffic on the Third Mainland Bridge for two weeks.

The bridge will be shut from Wednesday, January 13, 2021, for ongoing rehabilitation works, Jomog News Nigeria reports.

This was confirmed in a statement on Saturday by the Federal Controller, Works Lagos, Engr. Popoola Olukayode.

Olukayode called for cooperation and understanding from the public, especially motorists.

“The contractor plans to shift the current diversion point 2 kilometres towards Oworonsoki and close to traffic the Lagos Island-bound carriageway including the Adekunle bound slip road beside the current diversion points for two weeks starting from Wednesday, January 12, to 27, 2021 to enable her to remove, replace and cast in place joint 23 after the current diversion point alongside the other two joints, 16 and 17 she is working on presently on the Lagos Island-bound carriageway,” he said.

Olukayode stated that after casting of the three joints and asphalting, the whole Lagos Island-bound carriageway will be reopened to traffic.

LEAVE A REPLY

Please enter your comment!
Please enter your name here